Banff Community High School Vestibule
Location:
Banff, Alberta
Size:
87 ft2
Project Value:
$200,000
Contract Type:
CCDC 2 – Stipulated Price Contract
Client:
Canadian Rockies Public Schools
Prime Consultant:
Findlay Group Inc.
Year Completed:
2025
This project consisted of an addition to the main student entrance to the school. Foundation and a timber frame vestibule including canopy and glazing. The glulam and aluminum were designed to match the existing school aesthetic and to serve as a wind block to the main entrance doors. Once this was built, we were able to remove the interior vestibule giving the school more open space inside for furniture and gathering.







