Columbia Icefield Kitchen Renovation

Location:

Jasper National Park, Alberta

Size:

4,760 ft2

Project Value:

$294,000

Contract Type:

CCDC 2 – Stipulated Price Contract

Client:

Brewster Inc. c/o Kermode Projects Ltd.

Prime Consultant:

J.P. Sauter Architect

Year Completed:

2023

Project Description

The project featured renovating an existing kitchen storage area to expand the staff kitchen food preparation area and the addition of associated HVAC, all while remaining operational. The washrooms and lounge millwork was upgraded as well. The project also included was the gravel preparation for a new modular kitchen unit and connection to the existing building. Towards the end of the project, we were also asked to rebuild the foundation of the water pump shed at the edge of the lake which required materials to be delivered by helicopter to avoid driving over sensitive plants and ground cover. The work was performed in a remote work area in Jasper National Park on the Icefields Parkway and required wholistic preparation to ensure adequate material was supplied and properly removed.

Related Projects

  • Southwest Windermere CRU 1, CRU 9 and Sitework

    Edmonton, Alberta

  • M3 Office Tenant Fit-Out and Expansion

    Calgary, Alberta

  • Tiffin Windermere Tenant Improvement

    Edmonton, Alberta

  • Grifols Tenant Improvement

    Edmonton, Alberta