Edgemont CRU 2 & 3
Location:
Edmonton, Alberta
Size:
Combined 18,135 ft2
Project Value:
$4.9M
Contract Type:
Construction Management; Contract signed was CCDC2 – Stipulated Price Contract
Client:
Cameron Development Corporation
Prime Consultant:
Reid Architecture
Year Completed:
2024
Construction of two new buildings plus associated site work. These two steel structure buildings were 8,677 ft2 and 9,458 ft2 and were constructed simultaneously with a construction management approach. Exterior finishes were a mix of masonry, EIFS, metal cladding and aluminum storefront. The site was transformed from a greenfield site to a completed parking lot and drive through, complete with site services. Working with the Architect closely throughout design allowed us to revise details and reduce the overall budget without impacting the desired look of the building.