GEC Architecture Studio Renovation

Location:

Calgary, Alberta

Size:

10,297 ft2

Project Value:

$1.0M

Contract Type:

CCDC 5B – Construction Management

Client:

GEC Architecture

Prime Consultant:

GEC Architecture

Year Completed:

2023

Project Description

Construction manager for the renovation of the third-floor architect’s studio space. The work including infilling an existing stair opening between the second and third floor with structural steel and concrete, construction of a new kitchen area, new glass partitioned meeting rooms, wood baffling, and revitalized finishes. As the studio is located in an office building, adherence to the strict low-noise policy was essential and some work was completed after hours when necessary to accommodate an operating office space adjacent to our hoarding wall.

Related Projects

  • MIC Medical Imaging – Manning

    Edmonton, Alberta

  • National Music Centre Kitchen Renovation

    Calgary, Alberta

  • FreshCo 7655 – Manning

    Edmonton, Alberta

  • Best Buy 005 Beacon Hill

    Calgary, Alberta