Integral Group – Calgary Design Studio
Location:
Calgary, Alberta
Size:
6,800 ft2
Project Value:
$490,000
Contract Type:
CCDC 5B – Construction Management
Client:
Integral Group Consulting (BC) LLP
Prime Consultant:
LOLA Architecture Inc.
Year Completed:
2020
Working in the LEED certified Telus Sky Tower, the office fit-out focused on green building initiatives. Construction included the coordination of outstanding base building work with the landlord and Integral Group Consulting as well as the tenant fit out featuring Carma metering system, high end lighting controls, demountable partitions, and millwork fabricated from salvaged materials. Procurement of building materials included unused material such as carpet and tile from previous projects; items salvaged from various local businesses including bicycle tire rims for light fixtures, walls made from apple crates and glazing samples, and floor tiles used for the kitchen backsplash. The fit-out aimed at achieving the highest standards of LEED and Fitwel accreditation. Through our construction management approach we managed to divert 100% of the waste from the landfill by sorting and recycling waste products and using only re-usable food and beverage containers for staff lunches. The project was also featured in Sustainable Architecture & Building Magazine (Issue 75, Summer 2022) for their interior design award.








