M3 Office Tenant Fit-Out and Expansion

Location:

Calgary, Alberta

Size:

5,585 ft2

Project Value:

$556,000

Contract Type:

CCDC 5B – Construction Management

Client:

M3 Development Management Ltd.

Prime Consultant:

JC Interior Design

Year Completed:

2020 & 2022

Project Description

The original 3,500 ft2 office fit out and the subsequent 2,000 ft2 expansion included base building demolition of existing office spaces, polished concrete floors, millwork and stone counters, demountable partitions, wood doors, carpet, and acoustic ceilings.

In order to preserve the original feel of M3’s previous office space, we protected and transported their signature live edge kitchen table with a team of six men and two elevator operators to lift the counter to the 6th floor.

We successfully fitted out the expansion of this office in 2022 while the office continued to operate with minimal disturbance. We were able to find cost savings in refurbishing existing wood doors and frames while providing a seamless extension of the existing open concept office.

Related Projects

  • Kal Tire 768 at Grove on 17

    Edmonton, Alberta

  • The Shops at Buffalo Run – Gold’s Gym

    Tsuut’ina, Alberta

  • National Music Centre Kitchen Renovation

    Calgary, Alberta

  • Integral Group – Calgary Design Studio

    Calgary, Alberta