Manning Towne Centre Building L3 / Manning Village Building 4
Location:
Edmonton, Alberta
Size:
15,520 ft2
Project Value:
$4.9M
Contract Type:
CCDC 2 – Stipulated Price Contract
Client:
Cameron Development Corporation
Prime Consultant:
Hodgson Schilf Evans Architects Inc.
Year Completed:
2024
This project consisted of two buildings on separate sites. We completed the full site development scope for each building including, site services, parking lots and Drive Thru. The buildings were finished with a mix of metal cladding, masonry, EIFS and aluminum composite panels. We also built a massive pylon sign base for a sign that soars over 60 feet above the ground. In both spaces, we were able to allow the tenant’s contractors to take over their respective spaces before the base buildings were completed which allowed for the TI construction to begin ahead of schedule and allowed these buildings to start generating revenue.