National Music Centre Kitchen Renovation
Location:
Calgary, Alberta
Size:
4, 200 ft2
Project Value:
$250,000
Contract Type:
CCDC 5B – Construction Management
Client:
National Music Centre
Prime Consultant:
Kumlin Sullivan Architecture Studio Ltd.
Year Completed:
2018
Renovation of a new bar and kitchen in the historic King Edward Hotel space, the project involved mechanical and electrical tie-ins to existing systems. The design was not finalized at start of construction, however, work needed to start in order to attain occupancy prior to the start of the Calgary Stampede, ensuring that pre-booked functions did not need to be cancelled. Efficient and simplified design solutions to accommodate the schedule were crucial as was working around base building services and planning layout to control both the budget and schedule. Working in conjunction with the National Music Centre and their food service equipment supplier, we were able to fast-track the mechanical and electrical rough-ins, layout of all equipment, build walls, and rough-in all services before finalizing total costs and interior finish design components.