National Music Centre Kitchen Renovation

Location:

Calgary, Alberta

Size:

4, 200 ft2

Project Value:

$250,000

Contract Type:

CCDC 5B – Construction Management

Client:

National Music Centre

Prime Consultant:

Kumlin Sullivan Architecture Studio Ltd.

Year Completed:

2018

Project Description

Renovation of a new bar and kitchen in the historic King Edward Hotel space, the project involved mechanical and electrical tie-ins to existing systems. The design was not finalized at start of construction, however, work needed to start in order to attain occupancy prior to the start of the Calgary Stampede, ensuring that pre-booked functions did not need to be cancelled. Efficient and simplified design solutions to accommodate the schedule were crucial as was working around base building services and planning layout to control both the budget and schedule. Working in conjunction with the National Music Centre and their food service equipment supplier, we were able to fast-track the mechanical and electrical rough-ins, layout of all equipment, build walls, and rough-in all services before finalizing total costs and interior finish design components.

Related Projects

  • High River Building B

    High River, Alberta

  • Canada Post Corporation Retail Fit-Up

    Blackfalds, Alberta

  • Harvest Pointe Winners and Dollarama

    Edmonton, Alberta

  • GEC Architecture Studio Renovation

    Calgary, Alberta