Secord CRUs A, B and C
Location:
Edmonton, Alberta
Size:
17,875 ft2
Project Value:
$6.0M
Contract Type:
CCDC 2 – Stipulated Price Contract
Client:
Allard Developments
Prime Consultant:
Planworks Architecture Inc.
Year Completed:
2023
These three CRUs of various sizes were constructed simultaneously along with the full siteworks package and pylon signs for this development. There was a mix of aluminum composite panels, longboard siding, stone and EIFS on each of the buildings. We also completed the installation of the underground fuel tanks for the neighboring gas station. Two of the buildings each had their own drive-thru and one building had an outdoor play area for the daycare tenant that moved in.