The Shops at Buffalo Run – Gold’s Gym
Location:
Tsuut’ina, Alberta
Size:
30,000 ft2
Project Value:
$2.5M
Contract Type:
CCDC 5B – Construction Management
Client:
Taza Development Corp.
Prime Consultant:
Ti Studios Architecture Inc.
Year Completed:
2024
Complete tenant fit out in new base building commercial retail complex for Gold’s Gym complete with weight areas, spin studio, saunas, steam rooms and locker rooms. Construction included mechanical, sprinkler and electrical re-work; resilient and specialty flooring; wood and metal lockers and toilet partitions; aluminum and glazing; steel studs and drywall; painting; and solid surface counters. The millwork supplier was based in the United States to supply the standardized millwork products that are found throughout North American Gold’s Gyms. Cost efficiencies were realized by working with the base building contractor to leave portions of the slab out to reduce the amount of slab demolition and patching for our own underground plumbing and electrical work.