True Wild Distillery
Location:
Calgary, Alberta
Size:
9,500 ft2
Project Value:
$8.8M
Contract Type:
CCDC 5B – Construction Management
Client:
True Wild Distilling Ltd.
Prime Consultant:
Frank Architecture Inc.
Year Completed:
2024
Renovation of an existing heritage building to fit out a new distillery with bar, main kitchen, smaller food preparation areas, event and tasting spaces, as well as an outdoor patio. The project also included the sitework and the construction of an auxiliary building. Construction included mechanical, sprinkler and fire alarm upgrades/installations, overhead doors and fire shutters, hazardous materials abatement, and structural upgrades. Finishes included high-end millwork, solid surface counters, custom ornamental metalwork, window coverings, acoustic panels, textured wall finishes, and hardwood flooring. A major achievement of the project was being able to uphold the heritage aspect and integrity of the existing building.